Siding Boxes in Main
Room |
 |
|
|
Photo taken from
upstairs office, in the building's south-western corner. |
|
North Side Siding |
 |
|
|
The darker tone siding installed on
the northern side of the building, facing the old Shabbos House and the
campus. |
|
The Brick Accent |
 |
 |
|
|
Raizy stands by the delivery of bricks
which will accent the siding on the northern columns and the front
porch. |
First brick pillar on northern side of
building put up in the rain. |
|
Sukkah Deck Posts |
 |
|
|
After concrete footings and concrete
pillars (and layers of sand and gravel) came the wood beams which will
support the Sukkah deck posts between the back of the main room and the
water recharge basin. |
|
|
 |
 |
|
|
The cornerstone
(dedicated on September 14th, 2008) put in place. |
All bricked in on the
front porch near the main entrance. |
|
|
 |
|
|
Mushky poses on the
porch of Shabbos House on the Friday before her Bat-Mitzvah Celebration
at Nanotech for this photo of the new building to be included in the
powerpoint at her Bas-Mitzvah. |